top of page

Dubai Floor Tile Snagging Checklist: 7 Defects to Spot

Writer: RAMI
RAMI
Nov 13
5 min read

The floor tile defects that turn up most in a snagging inspection in Dubai are lippage (uneven tile edges you can feel with a bare foot), hollow-sounding tiles from poor adhesive bonding, cracked or crumbling grout lines, incorrect floor slope in bathrooms and balconies, mismatched tile batches with visible shade differences, unsealed expansion joints, and skirting boards that sit proud of the wall or gap at the corners. None of these show up on a quick walkthrough with the sales team — they surface weeks or months later as cracking, lifting, or water pooling near a shower tray. A pre-handover inspection from RAMI Property Inspections & Snagging, Dubai's property inspection and snagging company, checks every tile run with a spirit level, a tap test, and a slope gauge — flagging defects while the developer is still liable to fix them, rather than after your warranty clock has already started running.


Why Floor Tile Defects Are Easy to Miss at Handover

Floor tiles look finished the day you collect your keys. They're clean, grouted, and often still carry a thin protective film or polish. That finish hides exactly the problems that matter: a tile that sounds hollow under a light tap because the adhesive never bonded to the substrate, a run of tiles laid 2–3mm out of level with its neighbour (lippage), or a bathroom floor that slopes toward the door instead of the drain. None of it is visible to the eye in good lighting. It's part of a broader pattern we cover in our complete breakdown of common property defects in Dubai — problems that are invisible at handover tend to be the expensive ones a year later, whether they're in the tiles, the walls, or the MEP.


The 7 Floor Tile Defects RAMI Inspectors Check Most

These are the checks a RAMI inspector runs on every tiled room during a handover snagging inspection, from the main living areas to the smallest guest bathroom.


Defect

What to Look For

Why It Matters

Lippage (uneven edges)

One tile edge sits higher than its neighbour; catches a bare foot or a mop

Trip hazard that widens as foot traffic wears the raised edge

Hollow tiles

A dull, hollow sound when tapped with a coin or tool handle, versus a sharp, solid sound on bonded tiles

Signals poor adhesive coverage; the tile can crack or lift under furniture weight

Cracked or crumbling grout

Hairline cracks, powdery grout, or gaps wide enough to catch a fingernail

Lets water into the substrate, which can delaminate tiles and stain the subfloor

Incorrect floor slope (wet areas)

Water pools near the shower tray or balcony door instead of draining away

Standing water seeps into joints and can leak through to the floor below

Shade or batch mismatch

Visibly different tone or pattern between tiles in the same room, especially near doorways

Usually means two production batches were mixed; a cosmetic defect the developer should swap pre-handover

Unsealed expansion joints

No flexible sealant where tile meets a wall, column, or balcony threshold

Rigid grout across a joint cracks as the slab naturally shifts with temperature

Skirting and threshold gaps

Skirting sits proud of the wall, or there's a visible gap at external corners

Lets moisture and pests behind the skirting and looks unfinished from day one


From the Field

A scenario like this comes up often on apartment handovers across communities like Jumeirah Village Circle and Dubai South: the living room floor looks immaculate, polished, and freshly grouted. A tap test with the back of a screwdriver handle tells a different story — three tiles near the balcony door sound hollow, and a spirit level laid across the run shows a visible gap under one edge. Logged on the official handover snag list, the developer's contractor lifts and re-beds the tiles within the defects liability period at no cost to the buyer. Skip that check, and the same tiles typically crack within the first year of normal foot traffic — at which point the repair bill belongs to the owner, not the developer.


Common Mistakes Buyers Make With Floor Tiles at Handover

  • Accepting tiles that “look fine” without a tap test, because hollow spots stay invisible until a tile has already cracked

  • Checking slope by eye instead of with a level or a few drops of water, so a reverse-fall floor in a bathroom gets missed

  • Dismissing a grout crack as “cosmetic, we'll fix it later” instead of logging it on the official handover snag list

  • Not comparing tile shade across the whole room in daylight, so a mismatched batch near a doorway goes unnoticed under artificial light

  • Missing the window to report floor defects in writing — see our Dubai property inspection defect checklist for the other items that carry the same deadline risk


How Long Do You Have to Report Tile Defects in Dubai?

Most Dubai developers set a standard defects liability period of around one year from handover, during which flooring and finishing issues reported in writing are generally fixed at the developer's cost. A separate, longer warranty — commonly cited as up to ten years — is usually associated with structural elements rather than finishes like floor tiles, under general UAE civil law principles on construction liability. Floor slope problems in wet areas also overlap with waterproofing, which we cover in more depth in our guide to waterproofing and leak snagging in Dubai. Floor tile defects caught and logged during the inspection and handover window are the ones most likely to be remedied under warranty; defects reported after that window, or without documentation, are far harder to enforce. Exact DLP length, what's covered, and the claims process vary by developer and by your sales and purchase agreement, so always confirm the specific terms in your SPA and handover documents rather than assuming a standard period applies.


Frequently Asked Questions

Yes, within your developer's defects liability period, usually around one year from handover. It's harder to prove the defect existed before you moved in without an inspection report logged at handover, so report tile issues in writing as soon as you notice them.

No. A proper tap test uses light taps from a coin, a screwdriver handle, or a dedicated tile-sounding hammer — enough to hear the difference between a solid and a hollow tone, not enough to chip or crack a sound tile.

A small amount within tile industry tolerance is common. Lippage you can feel with a bare foot, or that catches a mop or a chair leg, is usually outside acceptable tolerance and worth flagging on your snag list.

No. Fixing it yourself, or paying a contractor before handover, can end your claim against the developer. Log it on the official snag list instead and let the developer's own contractor carry out the repair.

Wet areas — bathrooms, balconies, and kitchens — get a dedicated slope check toward the drain. Living and bedroom floors are checked for level and lippage rather than slope, since they aren't designed to drain water.


Floor tiles are one of the easiest defects to miss and one of the most expensive to fix once you've moved in and the warranty clock has run out. A tap test, a level, and a slope check during the handover inspection catch almost all of them while they're still the developer's responsibility.

Buying or receiving your keys soon? Get your snagging inspection before you sign. RAMI is a snagging company in Dubai that builds a tap test, a level check, and a slope check into every handover report — so hollow tiles and bad grout become the developer's problem, not yours.

  • Call/WhatsApp: +971552466250

  • Email: ops@ramipropertyinspections.com

  • Visit Us: Al Barsha 1, Dubai, UAE

Comments


Commenting on this post isn't available anymore. Contact the site owner for more info.

R A M I TECHNICAL SERVICES CONTRACTING L.L.C  © 2025 All Rights Reserved

 
bottom of page